How the front bore of the stick on a Case CX210 excavator was rebuilt and brought back to Ø80 mm in our workshop in Marcellinara, Italy: bore welding and line boring with the LBM400 Dual System, boss facing with the ORBITRUE 19 Manual.
Private customer (Italy)
Case CX210 crawler excavator — stick front bore
LBM400 Dual System (bore welding and line boring) · ORBITRUE 19 Manual (facing)
Ø80 mm × 100 mm bore rebuilt and faced in 3.5 hours
The job concerned a Case CX210 crawler excavator owned by a private customer in Italy. The point to repair was the front bore of the stick: with the pin working in a worn seat, play grew with every digging cycle. The customer brought us the arm, removed from the machine, and the work was carried out in our workshop.
Ø80 mm
Stick front bore, brought back to size for the new bushing.
100 mm
Weld overlay and line boring along the full length of the seat.
almost 5 mm
Thickness deposited to rebuild the seat before boring.
On an excavator, the front bore of the stick takes the loads of every pass. When the seat wears, the pin gets play and the wear spreads to the bushing and the boss face.
Worn pin seat and damaged boss face.
Fitting a new bushing in a bore that is no longer round soon brings back play and fresh wear.
Rebuild the bore and the boss face without replacing the stick.

The LBM400 Dual System portable line boring machine was mounted on the bore with supports on both sides, for bore welding and line boring. The boss face was machined with the ORBITRUE 19 Manual manual facing machine.
The same machine first carries out automatic bore welding inside the bore and then line bores it to size, without being removed or re-centred between the two steps. When this pays off is explained in our guide to the portable line boring and welding machine.
The ORBITRUE 19 Manual clamps inside the freshly machined bore (clamping range Ø25–152 mm) and faces the boss by hand, with no electric or pneumatic supply.
LBM400 bar inserted in the bore and centred with supports on both sides of the stick.
A first pass removes the damaged layer and leaves a clean base for welding.
Automatic spiral overlay of almost 5 mm along the full 100 mm of the seat.
Line boring the bore to Ø80 mm for the fit with the new bushing.
ORBITRUE 19 Manual clamped in the finished bore to face the boss.
New bushing fitted in the restored bore.
Ø80 × 100 mm
Rebuilt and brought back to size
3.5 hours
Weld overlay, boring and facing
Single set-up
No re-centring between the two steps
In our workshop
Stick repaired, not replaced
In 3.5 hours the stick front bore was rebuilt with almost 5 mm of weld overlay, line bored to Ø80 mm over a depth of 100 mm and faced on the boss, in our workshop. The stick was repaired instead of being replaced. More repairs are collected in our Maucotools case studies.
The stages of the job in our workshop: the bore before repair, mounting the bar, bore welding, line boring to size, facing with the ORBITRUE 19 Manual and the bushing fitted.
Pin bores, bushing seats and boss faces on earthmoving plant: Maucotools' engineers will help you choose the right set-up for weld overlay, line boring and facing, in the workshop or on site.